adidas Store:
Manchester Marathon
Ahead of the Manchester Marathon, the adidas Manchester store became a central operational hub supporting competitor registrations, event management and production activity linked to one of the UK’s largest running events. With connectivity requirements rapidly increasing in the days before the marathon, additional infrastructure became critical.
Ahead of the Manchester Marathon, the Adidas Manchester store became a central operational hub supporting competitor registrations, event management and production activity linked to one of the UK’s largest running events. With connectivity requirements rapidly increasing in the days before the marathon, additional infrastructure became critical.
-
Environment: Retail activation and live sporting event
Timeline: 72-hour installation turnaround
Challenge: Insufficient connectivity before a major live event
Solution: Load-balanced 5G sim connectivity with satellite resilience
Outcome: Reliable high-speed connectivity delivered before race day
-
Load-balanced 5G connectivity
Satellite internet resilience
Temporary WiFi deployment
Rapid deployment within 72 hours
Installed and tested ahead of live operations
Over 100Mb download / 50Mb upload available throughout
Capacity for 200+ simultaneous users
Event-ready infrastructure delivered under tight operational deadlines
Outcome:
Pinnacom delivered a fully operational interim connectivity platform within days, ensuring uninterrupted internet access for marathon management teams, registrations and operational staff ahead of race weekend.
Installed and tested within a compressed time frame, the system provided resilient high-speed connectivity throughout the event with no reported connectivity issues during live operations.
Challenge:
Just days before the Manchester Marathon, it became clear that the adidas store did not have sufficient internet capacity to support the operational demands of the event.
The site needed to accommodate:
Competitor registration systems
Event management teams
Production and operational staff
Increased demand during peak event activity
With the marathon approaching rapidly, a resilient temporary solution needed to be designed, deployed and tested within an extremely tight timeframe.
Solution:
Following notification of the issue midweek, Pinnacom installed the system Thursday evening after store closure and fully tested it on Friday morning ahead of marathon weekend.
To ensure resilience and consistent performance, Pinnacom implemented:
Load-balanced 5G sim connectivity
Satellite internet backup
Temporary WiFi infrastructure across the site
The deployment delivered stable high-speed connectivity capable of supporting more than 200 simultaneous users, while primarily servicing key operational and registration teams during the event.