ASK4 provides internet and communications services to large-scale student and residential accommodation developments across the UK. With buildings opening to residents on fixed deadlines, internet connectivity must be live and reliable from the moment residents move in, regardless of whether permanent fibre services have been delivered.

Modern high-rise buildings with green and white facades, partially obscured by leafy trees, under a sky with scattered clouds.

ASK4:

Point-to-point connectivity

Ask4 provides internet and communications services to large-scale student and residential accommodation developments across the UK. With buildings opening to residents on fixed deadlines, internet connectivity must be live and reliable from the moment residents move in, regardless of whether permanent fibre services have been delivered.

    • Environment: Urban residential infrastructure

    • Challenge: Fibre unavailable before site launch

    • Solution: Long-range point-to-point microwave connectivity

    • Outcome: Up to 2Gb connectivity delivered without traditional fibre installation

    • Point-to-point microwave connectivity

    • Rooftop-to-rooftop wireless deployment

    • Bandwidth delivery ranging from 500Mb to 2Gb

    • Link distances ranging from 100m to 7km

    • Typical reliability between 99.9% and 99.999%

    • Rapid deployment without fibre or civil engineering works

    • Scalable infrastructure for residential occupancy support

    • Multiple deployments delivered annually across urban environments

Outcome:

Pinnacom installed high-speed connectivity between soon-to-open sites by creating direct wireless links between buildings, bypassing the need for traditional fibre installation.

Using long-range point-to-point microwave systems, Pinnacom has delivered interim high-capacity connectivity across London and other urban environments, supporting residential buildings while permanent infrastructure is being completed.

Challenge:

New accommodation developments frequently face delays in fibre delivery, creating a critical problem ahead of resident move-in dates.

In these scenarios:

  • Internet services must still go live on time

  • Buildings often have no existing infrastructure

  • Nearby sites may have available bandwidth, but no physical connection exists between them

The challenge was to rapidly deliver resilient, high-capacity connectivity without relying on new fibre installations or disruptive civil works.

Solution:

Pinnacom designed and deployed long-range point-to-point microwave links between operational ‘donor’ buildings and newly opened residential sites.

These rooftop-to-rooftop wireless connections provided:

  • Direct transfer of high-speed internet between sites

  • Quick deployment without waiting for fibre installation

  • Flexible temporary infrastructure capable of supporting full residential occupancy

Installations have ranged from short urban crossings over major road junctions through to long-distance links spanning up to 7km between sites.

Deployments typically remain in place from one week to two years while permanent fibre infrastructure is completed.